2
Spent 3 weekends fixing a foundation that was 2 inches off
I kept seeing people pour concrete slabs without checking if the ground was level first lol. After my first shed settled crooked and the door wouldn't close, I used a 4-foot level and gravel pack to fix it. Anybody else have to redo a base because they skipped the prep work?
2 comments
Log in to join the discussion
Log In2 Comments
wendyc535d ago
Oh man, that's rough. Three weekends is a lot of work for something that should've been right the first time. At least you caught it before the door problem got worse.
8
ivanlewis5d ago
My neighbor's foundation cracked because he poured right before a freeze hit the wet mix.
5