Am I the only one who had a main suction hose blow out at 3 AM on a river job?
The 12-inch line split near the pump coupling during a gravel pull near Redding, and we lost over an hour of prime before we could get a patch and new clamps on it, so has anyone found a good way to spot those weak spots before they go?