Ran my first job off a clipboard and my second off a shared spreadsheet, and the difference was night and day
Last spring I ran a 14 unit townhome build outside Rochester off nothing but a paper clipboard and my phone, and I thought I had it all under control. Then in June we started a second job and the GC made us move everything to a shared spreadsheet that the foreman, the PM, and both subs could all see and update. The first month I hated it and kept my clipboard in the truck out of spite. But by week three I noticed we were not trading the same voicemail back and forth about whether the rough-in got signed off. The RFI log alone saved us, because two of them were sitting unanswered for six days on the paper job and nobody caught it until the inspector showed up. Punch list on the shared one closed in 11 days against 26 on the clipboard job, and I did not have to chase a single sub for a daily report. The kicker was my own super, a 58 year old guy who hates screens, admitting the sheet stopped him and the plumber from ripping each other's heads off over a change order. So now I want to know, does anyone here still run paper and make it work, or is there a middle ground that does not feel like you are babysitting a spreadsheet all day?