9
Six months of redoing my driveway apron paid off today
The old apron settled and cracked within a year, so I tore it out last spring and put in a 6-bag mix with fiber mesh instead of that cheap 4-bag stuff. My neighbor actually stopped to ask who did the work, first time anyone's complimented concrete around here. Anyone else spend way too long on a single slab before it finally looked right?
2 comments
Log in to join the discussion
Log In2 Comments
fisher.reese1d ago
Hold up, 6-bag mix is usually 5,000 psi stuff. 4-bag is more like 3,000. You basically built a driveway for a tank to park on, and I mean that as a compliment. Fiber mesh is a solid call too, keeps those hairline cracks from turning into canyons.
6
black.jordan1d ago
Is it just me or does that over-engineering instinct actually show up everywhere once you start looking? I see it in cooking all the time too, people throw an extra egg or a bigger pinch of salt into a recipe just because it feels right, even if the recipe works fine as is. It's like we all secretly want to build something tougher than it needs to be, and a driveway that could handle a tank is just the concrete version of that same impulse.
6