Found out a standard sidewalk slab only needs to cure 7 days before foot traffic, not 28 like I always heard
I was reading through an old ACI handbook my foreman left in the trailer last Tuesday and it said 7 days for foot traffic on a normal 4 inch slab. I always waited the full 28 days before letting anyone walk on a pour, and I've been doing this for 11 years. Turns out the 28 day number is for full structural strength, not for walking on it. I tested it on a driveway job in Fresno last month and nobody had any issues. Anyone else been overcuring their flatwork way longer than they needed to?