Hot take: the rust line on the pilings at the Corpus Christi marina tells you more than any survey report
I was down there for a small pier job and spotted the corrosion creeping up about 4 feet on the steel, which made me wonder how often those get pulled for inspection. How do you all track piling condition on jobs like that, or do you just wait for the callout?