My old lead in Gary said to double up on the firebox bolts, and I skipped it once
Back when I was still pretty green, a lead named Ray told me on every firebox job to torque the bolts in two passes, half spec then full spec. I thought it was overkill on a small package boiler in Gary and ran them down in one pass. Two weeks later the inspector found a weeping joint and we had to drain and redo it. Now I do the two-pass thing even on little jobs, but I'm curious how many of you stretch the bolt sequence out longer than the book says.