DAE rethink doing their own drywall mud after a guy at the Sandoval yard gave me a weird look?
I was loading 20 sheets of 1/2 inch drywall at the yard off 528 last Saturday and the guy helping me asked why I wasn't paying someone to finish it, and when I said I was doing the mud myself he just went quiet. He finally said he's seen more bad DIY tape jobs in Rio Rancho this year than in the past 5 combined, mostly because people rush the second coat. So now I'm second guessing whether my 3 coats over a weekend is actually enough time between them or if I'm setting myself up for cracks, what's the real minimum dry time you all use here in this dry air?