What action required if N2 supply failure in Dry Gas Seconda

Troubleshooting for the mechanical elements of the RigidBot

What action required if N2 supply failure in Dry Gas Seconda

Postby williamhawk » 14 Oct 2017, 13:52

We have the Cycle gas compressor in Polymer plant with DGS. Recently face problem of N2 supply failed from source. So in such condition N2 failure at secondary seal also. in such case what should be the our action ? Immediately compressor need to stop or we can run the compressor for 1 to 2 hrs for taking the safe plant shutdown. If compressor stop immediately, which lead to chunk formation in reactor which is also not desirable.

Please help.
Thanks!

I didn't find the right solution from the Internet.

References http://www.eng-tips.com/viewthread.cfm?qid=424968